Floor level, plumbing repaired (what a mess), added duct work for dryer vent, electrical repaired. Now plywood can finally be installed. It's been a balance beam act walking the joist and a flat surface will be very welcome.
posted by When it's over it's over, drink up. @ 5:27 PM
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home